| 
          
            |  |  
            | 
              
                | 
                  
                    | 
                      
                        |  |  
                        | 
                          
                            | Hot Water Circulator |  
                            | Run the first part of the hot water  distribution pipe work in 22mm. This can be reduced to 15mm and 10mm as  appropriate for the type of tap etc. Your aim should be to reduce the volume of  the hot draw-off pipe work to a practical minimum so that the time taken for  the hot water is as quick as possible. Do not use mixer tap or showers if the  balanced cold connection is not provided. Outlets of this type can back  pressurize the unit and result in discharge. Select a suitable position for the  expansion vessel. Mount it to the wall using the bracket provided and connect  to the inlet control set with the flexible hose provided. Ensure that the top  of the vessel is accessible for servicing. If there are to be showers, bidets  or taps in the installation then a balanced cold supply is necessary. There is  a 22mm balanced connection on the inlet control set.
 |  |  |  |  |  
            |  |  |